전기기사 실기 단답 귀에 때려박히는 기적의 영상 | 반복해서 계속 들으세요!
Main summary
Key takeaways
Main ideas & lessons (structured by topics)
1) Studying strategy for exam short-answer questions (Day 1 intro)
- The video compiles all short-answer questions that appeared on the Electrical Engineer practical (실기) exam, roughly from 2001 to 2024.
- It’s organized by question type (about 400 questions total).
- Suggested study approach:
- Listen to explanations like “radio” while commuting, before sleep, showering, reading, etc.
- Emphasize repetition as the key to memorization.
- Use the textbook PDF linked in the pinned comment.
Electricity & Overhead/Underground Line Fundamentals (core exam content)
2) Overhead line insulation / overvoltage control (Q1-type section)
Main concept: identify causes of overvoltage and how to prevent it.
- The text is partly garbled, but the lesson is clearly about overvoltage prevention mechanisms.
- A “three-way prevention” is mentioned; the three elements appear related to grounding and system configuration.
- Earthing/grounding concepts:
- Overhead ground wire / lightning ground wire role: provides shielding and helps prevent lightning impact from reaching the system.
- Grounding resistance should be small so fault current can drain effectively.
- If resistance is high, add additional buried branch earth wires to reduce overall grounding resistance.
3) Overhead line sag degrees & risks (Q2 section)
- Sag degree is used to assess risk.
- The video lists multiple sag-related “degrees,” emphasizing that too much or too little sag creates different hazards:
- Sag too large → vibration/contact risk with other overhead wires or during crossings (communication/road/rail).
- Sag too small → increased mechanical tension/energy → wire break risk.
4) Dampers on ACSR conductors (Q3)
- Dampers (especially for ACSR) are used to:
- add mass/weight to absorb vibration energy
- reduce oscillation caused by wind or impacts
5) Heavy ice/snow regions and corona design (Q4)
- In icy regions, ice forms through melting and refreezing cycles.
- Design assumptions mentioned:
- ice thickness about 6 mm
- ice specific gravity around 0.9
- Compare ice types: light, low-density snow vs heavy ice.
6) Underground power line installation methods (Q5–Q7)
Three installation methods:
- Direct burial
- Pipe (duct) method
- Culvert / underground tunnel (culvert-type)
Burial depth rule (intent):
- Burial depth depends on the method and whether vehicle/pressure risk exists.
- The video distinguishes cases where burial depth is 0.6 m vs 1 m, depending on method and pressure condition.
- Underground cables are used (contrasted with bare/insulated overhead conductors).
7) Cable types & moisture-blocking (Q8)
- Underground cables use key materials/types:
- lead-coated cable type
- aluminum-coated cable type
- Both are described as effective at blocking moisture.
8) Underground vs overhead power line advantages/disadvantages (Q9)
Advantages:
- Less exposure to weather (typhoons/rain) → reduced maintenance burden
- Aesthetic improvements (less “suspended in air”)
- Easier multi-line installation
Disadvantages:
- Lower transmission capacity due to different heat dissipation (underground cooling is worse than overhead air exposure)
- Higher construction cost and longer construction period (tunnels/ducts, excavation)
- Fault detection and maintenance can be harder
9) Power conduits & cable fire prevention (Q10)
- In conduits/tunnels, implement fire prevention:
- wrap cables with flame-retardant tape
- apply flame-retardant paint (described as “magic power” in the text)
Short-circuit / voltage regulation / busbar systems
10) Reducing system short-circuit capacity (Q11)
Methods list:
- Increase impedance → reduces short-circuit current
- Use a reactor (H-shaped reactor mentioned)
- Split the system into zones → reduces accident scale and short-circuit current
11) Voltage boosting and loss scaling (Q12)
- When voltage is boosted from V to 2V, the video explains how:
- voltage drop and losses scale inversely with voltage (statements resembling 1/V and 1/V² relationships)
- Takeaway: increasing voltage reduces voltage drop/loss rates.
12) Transformer substation busbar types & meaning of “ideal infinite bus” (Q13–Q16)
Busbar types (3 methods):
- Single busbar
- Double busbar (ring “Hwan” concept mentioned)
- “Fantasy mothership / mother bus” naming used as a diagram memory aid
“Infinite bus” concept:
- Treated as:
- voltage magnitude and phase remain constant regardless of load change
- “inertia constant” is described as the stability-maintaining property
- implies infinite capacity
Double busbar advantages (Q15):
- One busbar can be inspected/maintained while the other supplies power (service continuity)
Busbar switching circuit breaker purpose (Q16):
- Allows inspection/operation without interrupting power by switching between busbars
Conductor configuration, corona, and flicker
13) Multi-conductor method vs single-conductor (Q17)
Four advantages (listed):
- Increased transmission capacity (skin/“epidermal” effect reasoning)
- Reduced losses (effective radius change)
- Reduced inductance → improved stability
- Other electromagnetic benefits mentioned (including reactance behavior)
Three disadvantages (mentioned):
- Higher installation cost
- Multiple wires interact/twist
- Spacing/interactions introduce additional mechanical/electromagnetic constraints
14) Corona phenomenon & partial air breakdown (Q18)
- Corona occurs when voltage exceeds air breakdown level near conductors/insulators.
- Air near the conductor acts as an insulator until high voltage causes partial breakdown:
- produces crackling arcs/sparks
- generates ozone and electrical noise
15) Corona effects (Q19) and prevention (Q20)
Four corona impact points (essence):
- current leakage into air → power loss
- ozone accelerates wire corrosion
- induction/disorder on communication lines
- audible noise from discharge
Two prevention measures (Q20):
- increase conductor radius (use thicker conductor)
- use multi-conductor systems
16) Corona critical voltage formula factors (Q21–Q22)
Critical corona voltage depends on:
- wire radius/diameter (thickness)
- equivalent electrical distance
- air density (relative air density)
- temperature and weather coefficients
Key relationships described:
- larger diameter → higher critical voltage
- larger equivalent distance → higher critical voltage
- higher altitude → lower atmospheric pressure → lower critical voltage
- higher temperature → lower air density → lower critical voltage
17) Distribution line voltage adjustment methods (Q23)
Three methods:
- Automatic voltage regulator (SVR)
- Voltage boosting transformer
- Power capacitor (reactive power compensation effect)
18) Network power supply method (Q24)
Four advantages:
- parallel operation of multiple transformers keeps supply uninterrupted
- improved reliability
- low voltage fluctuation rate
- good adaptability to load increases
19) Flicker/blinking and countermeasures (Q25–Q26)
Flicker basics:
- occurs when supply voltage fluctuates significantly (often due to voltage drops and sudden load changes)
Supply-side countermeasures (3):
- raise voltage automatically when it dips (SVR/boosting case)
- use systems with large short-circuit capacity (more stable voltage)
- use dedicated transformer for sensitive loads
Receiver-side/compensation concepts (3):
- compensate the reactor component using capacitors
- compensate transformer-related voltage boost components (offset boosting issues)
- absorb load power fluctuations via appropriate reactive power compensation
Power factor correction (capacitors) & harmonics
20) Power factor improvement principle (Q27)
- Loads often draw inductive reactive current.
- Install capacitors in parallel to generate leading reactive current that cancels inductive reactive current.
- Result:
- reduced line current
- improved power factor
- reduced losses
21) Impact of worse power factor (Q28)
Three effects/penalties:
- increased current → higher I²R loss → higher electricity cost
- increased voltage drop/loss (due to current and reactive components)
- overall inefficiency increases
22) Capacitor installation purposes (Q29)
Four purposes:
- power factor improvement → reduce line current
- reduce power loss (I²R)
- reduce voltage drop
- reduce apparent power demand → free capacity / reduce required supply power
23) Capacitor sizing & overcompensation (Q30–Q31)
- Choose capacitor reactive power to match the load’s inductive reactive power (or slightly less).
- If too large → overcompensation:
- phase C can cause voltage rise
- power factor can worsen again
- harmonic issues may appear (generator/malfunction effects mentioned)
24) Harmonics caused by capacitors & series reactor solution (Q32–Q35)
- Capacitor banks can generate harmonics (notably 5th harmonic context mentioned).
- Solution: install a series reactor with the capacitor to behave like a filter.
- Memory points:
- theoretical required reactor relative to harmonic order
- practical selection includes margin:
- theory ~4%, practical ~6% (as stated)
- similar approach for 3rd harmonic with larger margin:
- ~11% theoretical, ~13% selected
25) Capacitor installation principles (Q35)
- Core constraints (intent):
- capacitor sizing must exceed the inductive part (text unclear about “ground,” but sizing logic is emphasized)
- Avoid switching/fusing arrangements that reduce reliability
- Use dedicated switching approach; direct connection on the main line is warned against due to switching surge and possible power factor drop if done improperly
- When eliminating harmonics: use series reactor
- Consider spacing/flamability (“oil sealing” and distance mentioned)
26) Capacitor bank equipment identification (Q36–Q38)
Exam-style components:
- Circuit breaker
- Discharge coil (to discharge residual voltage)
- Series reactor
- Power capacitor
Additional requirement:
- discharge coil should reduce residual voltage to ≤ 50 V within ~5 seconds
27) Capacitor equipment accident causes (Q39)
Three accident categories:
- busbar/connection-side short circuit
- capacitor device body short/insulation breakdown
- wiring short inside capacitor equipment
28) Protection devices for capacitor banks (Q40–Q41)
Converter/protection types (3 mentioned):
- overcurrent/circuit-breaker style protection
- overvoltage correction/operating device (trigger based on overcompensation activation voltage)
- undervoltage account unit (during outage: opens/disconnects)
Inspection items (3):
- terminal looseness + overheating
- thermal imaging/overheating check
- external insulation condition (ceramic/porcelain cracks)
Capacitor control, SVC, harmonics suppression, and THD
29) Capacitor switching control methods (Q42)
Control elements (4 categories):
- control based on reactive power / proxy similar to Young’s modulus (power factor relationship)
- current-based control
- voltage-based control
- reactive compensation logic (leading reactive compensation)
30) Neutral point detection methods for capacitor bank protection (Q43)
- NCS: current sensor (detects neutral current during faults)
- NVS: neutral voltage sensor (detects unbalanced voltage between neutral points)
31) Motor load + capacitor overcompensation risk (Q44)
- If capacitors cause excessively leading current:
- motor magnetic flux increases abnormally
- terminal voltage rises above rated value
- can damage the motor
32) SVC (static VAR compensation) concept (Q45)
- Uses thyristor switching for fast reactive power control:
- parallel capacitors + shunt reactors controlled by high-speed switching
- Purpose:
- stabilize voltage fluctuations
- suppress flicker
33) Harmonic current generation causes (Q46)
Three main causes:
- transformer/motor excitation (magnetizing nonlinear behavior)
- power electronic converters (inverters, converters, choppers)
- arc furnace processes (industrial arcs)
34) Harmonics effects (Q47)
Four disadvantages:
- equipment overheating / increased iron loss / mechanical/electrical stress
- protective relay misoperation due to waveform distortion
- communication line induction noise/data errors
- neutral conductor overheating in 3-phase 4-wire systems (harmonic components add)
35) Harmonic suppression measures (Q48)
Five measures:
- increase “pulse chopping” / reduce pulse width to smooth waveform
- harmonic filters
- series reactors (for capacitor harmonic suppression)
- multi-conductor/bundling for corona suppression
- delta transformer connection to trap/limit 3rd harmonic circulation
36) THD definition & calculation (Q49)
- THD uses RMS values:
- denominator: RMS of the fundamental component
- numerator: RMS of harmonic components (sum of squares)
- Video mentions an “external ratio” style memory approach.
Voltage unbalance limits (distribution systems)
37) Unbalance limits in single/three-phase systems (Q50–Q52)
Key limits stated:
- Single-phase 3-wire system imbalance rate: ≤ 40%
- Three-phase regulation: imbalance limit mentioned as ≤ 30%
Exceptions/special cases:
- dedicated transformer cases (low voltage)
- specific high-voltage/special conditions
- using multiple dedicated transformers
Memory mnemonic (“dates” 2 vs 3):
- relates to the equilibrium concept: distributing loads across phases/transformers to maintain balance
Low-voltage wiring and installation rules (Indoor cabling section)
38) Cable material selection (Q53)
- Distinguish vinyl-clad vs chloroprene-rubber (“captive cable”) types
- Use triangles/cross marks based on:
- exposed vs concealed installation
- voltage range (e.g., rules for 400 V and below mentioned)
39) Indoor low-voltage wiring methods (Q54–Q55)
Wiring permitted depending on environment, including:
- cable construction
- metal pipe
- vinyl-clad conduit
- cable tray construction
Conditions vary by whether installation is exposed/concealed and whether inspection is feasible.
40) When to omit switching devices (Q56)
Switch/disconnection device may be omitted in two cases:
- switching is already included as part of the equipment structure
- a dedicated branch circuit breaker exists for maintenance, so only that circuit is isolated
41) Distribution panel placement and design considerations (Q57–Q59)
Design considerations (5):
- wiring method (2-wire vs 3-wire, etc.) affects voltage drop and circuit protection choices
- load usage rate (simultaneous operation assumptions)
- expansion allowance and spare capacity
- route/path length affects voltage drop/power loss
- inspection needs: add inspection ports during design
Panel installation rules (Q58):
- one per floor
- branch circuit length: ≤ 30 m
- total circuit breaker count:
- ≤ 42; if exceeded, split into two panels
- mounting heights:
- top ≈ 1.8 m
- mid ≈ 1.4 m
- bottom ≈ 1.0 m
- separate commercial vs emergency power supplies (no crossover)
Outlet placement rules (Q59–Q60, partial):
- avoid outlets in certain branching sections
- minimum outlet rule by room area:
- based on 5 m² steps with increasing counts
- example direction: ≥ 15 m² → 3 outlets (text garbled, but the intent is area → minimum outlets)
42) Voltage drop limits and starting current exception (Q62)
- Voltage drop limits differ by system (example):
- lighting circuits: about 3% (and higher allowances in other situations)
- Exception:
- motor starting inrush allows exceeding limits (referenced “minimum table exceptions”)
43) Wiring accessories: boxes and conduits (Q63–Q64)
- Regular/junction box: for conduit interconnection
- Pull box (full box): used to allow long conduit pulling
- Components mentioned:
- locknut, bushing, coupling, saddle/band, ring, switch box, outlet box
44) Time-of-use night power system (Q65)
- Uses a time switch and a nighttime tariff meter
- Night-only devices operate after a set time (e.g., after 10 PM) and are off by morning
- Wiring/installation considerations follow similar branching and conduit rules
Lighting fundamentals (color temperature, color rendering, efficiency, types)
45) Blackbody & color temperature (Q66)
- Kelvin is absolute temperature:
- 0°C = 273.15 K
- Approximate color temperatures:
- ~2700 K: reddish
- ~6500 K: daylight / bluish-white
- Light color corresponds to blackbody temperature conceptually.
46) Color rendering (Q67)
- Depends on how the lighting spectrum matches a standard (solar spectrum).
- Color rendering index (CRI) concept:
- higher CRI → closer to true object colors
- lower CRI → more color distortion
47) Luminous efficiency / lighting efficiency (Q68)
- Two related metrics:
- lighting efficiency: emitted light energy / input power
- luminous efficacy: luminous flux (lumens) vs input
48) Principles of light emission (Q69)
Three principles:
- thermal radiation
- electric luminescence (gas discharge)
- deployment/luminescence (LED/semiconductor emission)
49) Photodegradation compensation rate (Q70)
- As lamps age, brightness decreases.
- Design uses a maintenance margin (e.g., design higher like 115 lux to achieve 80 lux later).
50) Fixture light distribution categories (Q71)
- Direct lighting
- Semi-direct lighting
- (The provided text ends mid-list; remaining items are not present.)
Rate this summary
Your feedback will help improve summaries.
Improve this summary
Reprocess with a stronger model when the summary feels incomplete or inaccurate.
Translate summary in another language
Ask questions to this video
Chat for follow-up questions, clarifications, and source-backed answers.