Dream home build (New Zealand) — overview

  • Josh (the speaker) builds his family home for under $500,000 on a difficult sloped section in Upper Hutt, NZ.
  • He takes a year off work to focus on the project and shares the build start-to-finish (including setbacks and time-lapses/vlogging).

Site & concept planning highlights

  • Target location/area: Upper Hutt suburb; the section is described as “the section nobody wanted.”
  • Key site problems identified early:
    • Slope
    • Shared right-of-way access with two other houses
    • Drainage easements across the middle of the site limiting the build platform
    • Power lines feeding a neighbor’s house crossing the site (needed to be dropped/undergrounded)
    • A protected totara tree near where the garage would ideally go (a no-go zone during the build)
  • Final layout choice to work with the land and constraints:
    • Basement garage to use the natural slope flow
    • Studio next to the garage
    • Main house upstairs (one-level): 3 bedrooms, 2 living areas
    • Designed to capture north-facing sun:
      • Two large outdoor spaces north-facing for midday-to-evening light

Early setback: injury while clearing the section

  • He mowed lawns early on and slipped while working on uneven ground/bank.
  • Toe injury required:
    • Orthopedic assessment
    • Surgery (toe cut/open wound; shoe/grass/foreign material removed)
    • 4 weeks in a moon boot (off his feet)
  • This delayed momentum, but the build continued.

Permitting + planning reality checks

  • Josh notes there’s significant pre-build decision-making:
    • Product choices, design details, and plan setup must be resolved before much physical progress happens.
    • Lead times (e.g., engineers, pre-nailers, etc.) matter.
    • Consents reportedly required extensive documentation (auto-captions suggest many “trees” pages—likely indicating lots of paperwork/attachments).

Earthworks, set-out, and foundations

  • Establishing heights/lines:
    • Uses a story rod/laser and leveling approach to set batter lines and levels.
  • Set-out challenges:
    • House set-out described as extremely hard due to non-straight boundaries and many corners.
  • Foundation engineering approach (unstable/previous gully fill):
    • After discovering old gully/filled ground was poor quality deep down, he worked with the engineer.
    • Drilled ~450m holes (interpreted as many boreholes) to reach good ground
    • 57 holes filled with concrete, then a standard house piling system on top.
  • Inspections passed before foundation work started:
    • Site/sighting inspections
    • Engineer inspection (depth confirmation)

Foundation build approach & milestones

  • Due to slope/design, they selected:
    • Timber subfloor, but poured a concrete slab for the garage (including footings/perimeter system).
  • Ongoing build friction:
    • Rain made work harder; tools/gear had to be dried daily.
    • A rough day included equipment issues (broken starter cord), minor accidents (clipped neighbor’s mailbox), and delivery mistakes (wrong steel sent).
  • Milestone:
    • After passing inspections and setup, they prepared to pour concrete, and the build began “getting out of the ground.”

Framing + factory tour / engineered components

  • Timber framing used for earthquake resilience and local sustainability.
  • Mentions a factory visit near the Kapiti Coast to see truss/frame fabrication offsite.
  • Structural moment:
    • Installed a major steel beam over the garage:
      • Mid-floor uses timber joists, but they couldn’t span fully across the ~7m garage
      • Steel beam transfers loads down to foundations
    • Beam installation support mentioned from a local company (ITM), helping with lift positioning.

Roof, cladding, and weatherproofing

  • Roof framing:
    • Front: ~8° rafter roof
    • Back: ~5° truss roof
  • Roof product:
    • Roofing iron, profile “Mc700” (trapezoidal)
    • Notes a mix of overhangs/no-eaves areas around openings.
  • Cladding:
    • Hardie/Hardis “Home RB” (described as a solid skin/cladding layer)
  • Weatherproofing milestone:
    • During NZ COVID-era nationwide shutdown, they temporarily paused.
    • Because lockdown timing was uncertain, they were glad they installed RAB/redboard (weather-tight; described as standing up to 180 days).

Lockdown effect (4–6 weeks)

  • The Prime Minister announced a 4-week nationwide shutdown, which extended to 6 weeks.
  • They shifted into “closedown mode,” relying on the weatherproofing already installed.

Services, insulation, plaster, and internal finishes

  • Electrical/plumbing preparations:
    • Pre-piping and planning for an 8kW heat pump.
  • Insulation upgrade:
    • Installed Pink Batts and calls it a “best bang for buck” comfort improvement.
  • Plastering:
    • Jib plasterboard installed by a small crew, followed by painting and interior works.
  • Flooring strategy:
    • Hard flooring includes:
      • Timber/wood overlay in main areas
      • Tiles in wet zones
    • Josh does/installs substantial floor work (notes ~200 hours).
  • Interior milestone:
    • The “touchable” finished wall transition happens once plaster goes on.

Kitchen, fireplace, and notable design decisions

  • Kitchen redesign:
    • U-shaped peninsula didn’t work, so they changed to a walk-around island/peninsula layout.
    • Feature storage concepts mentioned (e.g., “magic corner”/draws).
  • Fireplace choice:
    • Plyc fire with a wet back for efficiency.
    • Required a 20mm insulating non-combustible board under it for safety.
    • Custom edging built with wood trim for tile transitions.

Deck, windows, skylights, and outdoor works

  • Deck:
    • Large deck supported by a portal/frame straddling the studio so loads transfer to both sides.
    • Steel beam installed first, then joists; sloping sides created extra work.
  • Balustrade:
    • Aluminum fins made in Auckland and shipped down.
  • Landscaping:
    • Many finishing touches come as smaller tasks:
      • Planter boxes filled
      • Garden/feature areas and stone/golf-ball-style pavers (staggered random sizes)
      • Firewood shed
      • Stair work to connect levels
      • Work-from-home office area
      • A workshop-style mini ramp for kids/family use

“What I’d do differently” (lessons learned)

  • Wear steel caps when mowing.
  • Think earlier about landscaping:
    • Waiting until the building was in place meant more carrying by hand.
  • Fireplace aesthetics and storage:
    • Would lift the fireplace higher to improve appearance and allow wood storage underneath.
  • Subfloor choice:
    • Would likely change away from timber subfloor due to sound/noise transfer (“elephant feet” stomping sounds).
  • Door upgrade:
    • Use solid-core interior doors to reduce noise.
  • Floors:
    • Would consider alternatives to the timber overlay floor method.
  • Keep many good upgrades:
    • Hardie/RB cladding
    • Insulation
    • Skylights
    • Consistent interior joinery height matching external (noted as ~2.2m)
    • Some window framing changes were made later on-site.

Skills, time investment, and financing (process mindset)

  • Skills development:
    • NZ building apprenticeship (3–4 years) to build capability.
    • Builds experience through multiple sites before taking this one on personally.
  • Mental commitment:
    • Took a year off work, treating the project as a full-time mental undertaking, not just physical site time.
  • Financing:
    • Used savings (no bank loans).
    • Mentions a cash reserve around $810k from selling prior properties/investments (“pot of gold”).

High-level cost breakdown (as stated)

Note: Costs are from 2019 pre-COVID price levels; build rates rose afterward. Josh also had industry reputation and supplier channel deals.

  • Total approach (key lines):
    • Section: $265k
    • Drainage/power fixes (plus legal fees included in “all in”): effectively ~$285k all-in for section + legal/related (wording suggests combined total)
    • Plans/design/engineer/council fees: ~$25k
    • Excavation: $6k
    • Drilled piles: $8k
    • Garage slab (66m² slab cost): ~$72k
    • Mid-floor materials & labor: $24k
    • Frames: $22k
    • Spouting + roofing: $119k
    • Building materials incl. cladding: $70k
    • Steels (items): $2k
    • Insulation: $5.5k
    • Garage door: $22k
    • Windows: $21k
    • Electrical: $22k
    • Plumbing: $155k
    • Infinity/gas + gas hot water (downstairs): $2k
    • Heat pump: $32k
    • Ducted system: $22k
    • Fireplace + wet back: $5.2k
    • Plastering inside: $6.5k
    • External paint DIY: $1.2k
    • Interior painting by painter: $72k
    • Kitchen: $20k
    • Appliances: ~$7.2k
    • Carpet: $7.5k
    • Tiles: $2.3k
    • Shower glass: unclear (subtitles unclear; later mentions bathroom fittings as $10k)
    • Timber wooden flooring: $8k + 200 hours labor + $1k glue
    • Bathroom fittings: $10k
    • Concrete driveways: $7.5k
    • Landscaping/planter boxes: $6k
    • Landscaping more broadly mentioned later as ~$18k, deck: $18k
    • Blinds: $3k
    • Wardrobes: ~$2k?
    • Steel portal for deck: $2k
    • Steel beam for garage: $800
  • Josh’s summary:
    • Start total: “just under $800k” including section and build (subtitles suggest ~$265k section + ~$465k build, with remaining costs beyond that).
    • He values the final end product as “in the mid ones.”

Final reflection & encouragement

  • He calls building both rewarding and taxing, and says it helped grow his YouTube channel and building company.
  • Advice:
    • Break big projects into small steps.
    • Plan, solve constraints, and keep moving forward despite setbacks.
    • If an “aha” moment happens, write it down and act on it.

Notable locations/products/people (from subtitles)

  • Locations:
    • New Zealand
    • Upper Hutt (suburb)
    • Kapiti Coast (factory trip)
    • Nearby greenery/remu/manuka area for a preview of the next build
  • Products/materials:
    • Pink Batts
    • Hardie/RB board (Home RB / Hardis) cladding/skin
    • RAB/redboard weatherproofing
    • Mc700 trapezoidal roof profile
    • Hard flooring + tiles
    • Plyc fireplace with wet back
    • Skylights
  • Organizations/companies/people:
    • NZ Prime Minister (lockdown announcement)
    • ITM (help with steel beam lift)
    • Adam and an on-site crew (plaster/works mentioned)
    • Hardies (cladding mention)
    • Pink Batts (brand reference)

Original video