Video summary
Robert Vallis of Tiger Gold Corp. talks to Robert Sinn | Metals Investor Forum Sept. 2026
Main summary
Key takeaways
Asset acquisition & positioning (why Tiger Gold chose the ground)
- Found through a broader asset package
- Tiger Gold located the asset while evaluating a package of other assets across the Mid-Caucasus / other jurisdictions.
- Why it was available
- The asset was in storage because a small Australian exploration company ran out of funds.
- Key attraction themes for development/operations
- Construction/operation success factors, including:
- Road access
- Paved surface
- Local population
- General country/jurisdiction attractiveness
- Geological potential, including:
- Nearby deposits
- Permitting progress
- Construction/operation success factors, including:
Deal structure / commercial control
- Acquisition price: A$7.5 million
- Payment terms: phased payments over one year
- Completion timing: completed in June of this year
- Outcome: Tiger Gold would have full control over the asset
Geological thesis & growth plan (resources → scale → production)
Deposits and catalysts mentioned
- Miraflor field
- Already discovered
- Already designed
- Recently received a permit for construction and operation
- Nearby drilling outcome
- Earlier developer drilled near Miraflor to support a plant and found:
- Tesorito deposit: ~1.5 million ounces
- Earlier developer drilled near Miraflor to support a plant and found:
- Current drilling focus and acquired package fields
- Seibal field / “Seabell”
- Active drilling
- Surface/open-pit friendly characteristics
- Other fields in the acquired package
- Chuscal (referenced as “Chuska/Chuscal”)
- Drilling now
- Dos Quebradas
- ~0.5 million ounces historically (further north), implying strong “northern quadrant” potential
- Chuscal (referenced as “Chuska/Chuscal”)
- Seibal field / “Seabell”
Core operating concept: near-surface ore + depth potential
- Most reserves are on/near the surface
- Described as “coming right out onto it,” enabling quick detection
- However, Tiger Gold believes the near-surface ounces are likely fed by deeper geological systems
- Framed as a potential “porphyry source / big engine”
Resource doubling strategy (explicit target)
- Bottom-line claim
- A major catalyst to double resources (described as “double our resources”)
- Stated target
- If they identify primary resources of ~1.5 million ounces (paired with/adjacent to Tesorito), it would catalyze:
- Increasing facility production potential
- Increasing total resources
- If they identify primary resources of ~1.5 million ounces (paired with/adjacent to Tesorito), it would catalyze:
Drilling program mechanics (how they’re expanding scale)
Seabell expansion method
- Expanded from the core by drilling around it using 100-meter increments
- Repeated approximately four times
- Outcome:
- They couldn’t find the mineralization limit (a “nice problem”)
- Interpretation:
- Edges are appearing, but overall scale is still undefined
Grades / continuity (performance described)
- Reported drilling results (Seabell):
- Depths: 400–600 m
- Gold grades: ~0.6–0.7 g gold/ton
- Continuity: described as rare for large-scale gold deposits
- Suggests strong deposit geometry suited to quarry/open-pit style development
Depth extension workflow
- Described pattern:
- Metal content increases with depth
- Copper trace indicators begin to appear at depth
- Breccia mineralization suggests deeper processes may be “more interesting”
- Plan:
- Continue to benefit from shallow/open-pit layers for immediate uplift on Seabell
- Then return to deeper drilling, likely from end of this year
- Continue exploring additional property targets
Copper vector / deeper system hypothesis (exploration approach)
Question being answered
- How to determine the “vector” of copper movement toward a potential deeper porphyry source
Evidence used (so far)
- Deep wells under Tesorito (~800–900 m)
- Gold indicators increased from ~0.6–0.65 to ~2–3 g
- Copper began to appear
- Carrier mineral / breccia
- Highlighted as a geological control
- Associated with deep mineralizing systems
Current limitation
- The direction of copper movement is not yet defined accurately
- “More than smoke,” but not precise enough
Implied exploration playbook
- “Peeling back onion layers”
- Drill deeper under key zones
- Interpret breccia/carrier minerals
- Triangulate to locate the deeper driver system
Mine-life / grade replacement concept (operational strategy)
- Tiger Gold describes an approach where:
- Everything discovered becomes part of the replacement process
- If new zones show higher grade, they replace lower-grade material
- Result:
- Extends mine life by upgrading the resource model over time
Economics & market positioning (high-level; emphasis on execution)
PEA strategy and why the market may be underpricing
- They published a Preliminary Economic Assessment (PEA) immediately upon going public to demonstrate:
- Economic viability
- Stability
- Management cited “fundamental indicators,” including:
- A targeted 100% increase in resources in less than a year (positioned as unmatched in their peer group)
Main market misunderstanding: jurisdiction perception
- Colombia is framed as having historically been viewed as higher risk (“15 years ago”)
- Management argues conditions have improved:
- Reduced security risk
- Increased government attention/support
- Permitting and taxation now have a “solid base”
- Foreign investment and infrastructure are improving
Comparator example used
- Aris Mining (~25 km north)
- Producing ~250,000 oz/year
- Targeting ~500,000 oz by end of the year
- Management uses this to argue the region is becoming recognized as:
- Investable
- Operationally workable
Execution principle
- Emphasis on disciplined, consistent communication with the market/shareholders to reflect value creation
Metrics / targets / timeline (explicit)
Capital / acquisition
- A$7.5M purchase
- Paid phased over 1 year
- Completed in June (of the current year)
Resource & project targets
- Resource growth target: +100% in < 1 year
- Strategic outcome: double resources
- Primary resource aim referenced: ~1.5M ounces (adjacent to Tesorito) as a catalyst
- Resource categorization strategy
- Move from lower-confidence buckets to Measured & Indicated
- “Jump” over categories to accelerate engineering design inputs
Operational schedule
- By end of this year
- Results from three rigs
- Drilling primarily applies to Cbell/Seabell
- Early November
- Drilling targeted for primary resources at Cbell
- End of this year → onward
- Shift to Chuska/Chuscal test drilling, then other targets
- First quarter next year
- Continued drilling; two MRE updates
- Measured & Indicated resource updates:
- Tassels update + new resources from internal drilling
- new primary Cbell resources progressing toward measured/indicated
- Measured & Indicated resource updates:
- Continued drilling; two MRE updates
- Second half of next year
- Use updated MRE inputs for feasibility study engineering design
- First quarter (current stated question)
- Updated PEA expected alongside first-quarter resource work
- Target timing: end of Q1
Presenters / sources
- Robert Valdez, Tiger Gold
- Robert Wallace, Tiger Gold
- Interviewer: Robert Sinn (Metals Investor Forum context; referenced as “talks to Robert Sinn”)
Rate this summary
Your feedback will help improve summaries.
Improve this summary
Reprocess with a stronger model when the summary feels incomplete or inaccurate.
Translate summary in another language
Ask questions to this video
Chat for follow-up questions, clarifications, and source-backed answers.