Video summary
Stock Transfer With Delivery in SAP MM - Intra and Inter Company STO | SAP MM-SD Integration
Main summary
Key takeaways
Overview (topic + series context)
- This video is Part 2/series on SAP MM stock transfer.
- It focuses on the 3rd process: Stock Transfer with Delivery using SAP MM–SD integration, covering both:
- Intra company code STO (delivery route via SD)
- Inter company code STO (delivery route + billing/invoicing)
- Earlier parts covered:
- Inventory management route (MM-only movement postings: e.g., 301/303/305 and 351/101 in STO without delivery)
- Purchasing route using STO + goods issue 351 + goods receipt 101
1) Intra-company-code STO using Delivery (MM–SD integration)
Business flow / transactions (4-step, two-step option)
-
Receiving plant creates STO
- T-code:
ME21N - STO document type: UB
- T-code:
-
Supplying plant creates delivery against STO
- T-code:
VL10B - Delivery type: NL
- T-code:
-
Supplying plant posts Goods Issue against the delivery
- T-code:
VL02N(picking/post GI) - Movement type:
- 641 for two-step
- 647 for one-step
- Key difference: GI is posted against delivery, so 351 is not used
- T-code:
-
Receiving plant posts Goods Receipt
- Movement type: 101
- GR can be posted against delivery (recommended) or STO
- Posting GR against delivery ensures SD-side document flow updates
Financial/document handling notes (intra-company)
-
When 641 is posted:
- Financial entries happen
- Inventory credit for supplying side
- Inventory debit for receiving side (same company code)
- Financial entries happen
-
When 101 is posted:
- No additional FI document
- Only quantity placement in receiving plant storage location
Stock in transit validation
- After GI 641 but before GR 101:
- Stock in transit visible via
MB5T
- Stock in transit visible via
- After GR 101:
- Stock in transit removed
Document flow visualization
- Posting GR against outbound delivery enables the complete SD/MM flow:
- STO → delivery → picking → 641 → GR against 641
2) Configuration required to make STO-with-Delivery work (intra-company)
A core concept is: the system populates a “Shipping” tab in STO (ME21N) only if SD-related + MM-related configuration is complete.
The “shipping tab” importance
- Shipping tab appears only when the STO is treated like a sales order-like document from the supplying plant, so the supplying plant can create a delivery.
- The video shows:
- STO created using the MM route → shipping tab missing
- STO created with the delivery route config → shipping tab present
Required setup areas (4 main parts)
-
SD configuration
- Create Sales Area:
- Sales Organization + Distribution Channel + Division
- Assign sales area to the supplying plant’s company code
- Create Sales Area:
-
Sales master data
- Create/extend:
- Customer master for the receiving plant (customer role concept)
- Material master sales views for the supplying plant’s sales area
- Create/extend:
-
MM configuration (plant shipping data + delivery type + step model)
- Define shipping data for plants (links):
- Supplying-plant → sales area
- Receiving-plant → customer code
- Configure delivery type by:
- STO document type (UB) + supplying plant
- Delivery type becomes NL
- Configure one-step vs two-step procedure:
- Two-step: 641 then 101
- One-step: 647 then simultaneous 101
- Define shipping data for plants (links):
-
Logistic execution config
- Shipping point determination from:
- Shipping condition (from receiving plant customer master)
- Loading group (from material master)
- plus shipping point/assignment to plant
- This shipping point fills the shipping tab
- Shipping point determination from:
Tutorial-style demonstration: one-step vs two-step (intra-company)
- After enabling one-step:
- Movement type changes from 641 → 647
- System creates 647 and 101 simultaneously
- Storage location requirement changes in one-step:
- Since GR posts automatically, you must set storage location in the STO
- Otherwise, GI fails with “storage location required”
3) Inter-company-code STO using Delivery (delivery + billing + invoicing)
Key conceptual differences vs intra-company
Inter-company involves more SD/MM financial steps:
- GI triggers sales-like accounting + consumption (COGS)
- Delivery leads to billing
- Receiving plant GR leads to invoice receipt (Miro)
- Sending plant effectively handles order-to-cash side
Comparative note:
- Intra-company: often only GI stage has FI impact; GR has none (as demonstrated)
- Inter-company: FI postings occur at multiple stages including GR, billing, and invoice receipt
Business flow (two-step + one-step variants)
Two-step (as demonstrated)
-
Receiving plant creates STO
- T-code:
ME21N - STO document type: NB
- Uses supplier code (vendor) of the supplying plant
- T-code:
-
Supplying plant creates delivery
- T-code:
VL10B - Delivery type: NLCC
- T-code:
-
Supplying plant posts Goods Issue
- T-code:
VL02N - Movement type: 643 (two-step)
- T-code:
-
Supplying plant creates billing document
- T-code:
VF01 - Billing type: IV
- T-code:
-
Receiving plant posts Goods Receipt against outbound delivery
- Movement type: 101
- In inter-company, GR posts FI entries
- inventory debit + GRI clearing credit
-
Receiving plant posts invoice (Miro)
- T-code:
MIRO - Vendor = supplying plant
- T-code:
One-step variant
- GI movement type becomes 645
- System posts 645 and GR (101) simultaneously
Financial posting highlights (inter-company)
-
At GI (643/645):
- Sales-like posting:
- inventory credit (supplying)
- COGS/consumption debit
- Sales-like posting:
-
At GR (101):
- inventory debit
- credit to GRI clearing account
-
At Billing (IV):
- customer debit
- sales revenue credit
-
At Invoice receipt (MIRO):
- clears GR/GRI clearing
- credits vendor (supplying plant)
Validation/demonstration steps
- Demonstrates:
- accounting differences between intra vs inter at GI stage
- document flow in delivery/billing documents
- FI document links to each stage via PO history / FI document display
4) Configuration summary for order types & movement/delivery/billing logic (final recap)
STO order/document types
- Inventory management route: order type not applicable
- STO without delivery: UB
- STO with delivery (intra-company): UB
- STO with delivery (inter-company): NB
Movement types by scenario
-
STO without delivery (two-step):
- 351 (GI) and 101 (GR)
-
Intra-company STO with delivery:
- two-step: 641 + 101
- one-step: 647 + 101
-
Inter-company STO with delivery:
- two-step: 643 + 101
- one-step: 645 + 101
Delivery types / schedules
- Intra-company delivery type: NL
- Schedule line category: NN
- Inter-company delivery type: NLCC
- Schedule line category: NC
Billing/invoicing only for inter-company
- Billing type: IV
- MIRO processing is performed for the receiving plant
Pricing/valuation concept
- For MM-based STO variants (including the demonstrated delivery STO cases):
- pricing generally uses supplying plant’s valuation price
- In inter-company STO, the demo indicates manual price input affects invoice processing
Main speakers / sources (end)
- Speaker: the YouTube creator/host (referred to only as “Hey everyone” / “welcome back”; no explicit name given in subtitles)
- Source system: SAP (MM–SD integration concepts demonstrated using standard SAP transactions such as
ME21N,VL10B,VL02N,MIGO,MB5T,VF01,MIRO, and configuration viaSPRO)
Rate this summary
Your feedback will help improve summaries.
Improve this summary
Reprocess with a stronger model when the summary feels incomplete or inaccurate.
Translate summary in another language
Ask questions to this video
Chat for follow-up questions, clarifications, and source-backed answers.