How to Plan Your UAT - User Acceptance Test Plans That Work! | Business Analyst Training
Main summary
Key takeaways
Main ideas & lessons (UAT planning and success)
-
Purpose of UAT (User Acceptance Testing): UAT verifies/validates that the software (feature/enhancement) actually solves a real business problem from the end-user perspective, before release to production.
-
Why UAT is necessary:
- QA testing may use dummy data and an artificial environment.
- UAT tests in an environment similar to production with real/production-like data, ensuring the system works with other data, other systems, and all planned use cases.
- Prevents releasing something that fails for real users, which can damage reputation and create additional issues.
-
UAT is a “final gate”: A thorough final validation that builds confidence that the release is safe.
-
What success depends on: The creator emphasizes three key factors: people, process, and priority.
Methodology / process for running and planning UAT (detailed steps)
1) Define why you’re doing UAT
- Confirm that the solution matches what stakeholders approved at the start and what was built from requirements/user stories.
- Ensure the product works as a whole, not just sprint-by-sprint demos.
- Validate that it works in a production-like operational environment where real-world factors and integrations exist.
2) Build the right UAT team (who participates)
-
Primary responsibility:
- A Business Analyst or product team typically leads/organizes UAT and coordinates with users.
-
Testers / participants:
- End users (ideal customers/customers) when appropriate (often with concerns about confidentiality).
- Proxy users when end customers can’t participate—people who understand customer journey/expectations well, e.g.:
- Customer support / customer service
- Trainers
- Designers (speaker suggests they may be “too close” and focus on trivial UI differences)
- Product team roles:
- Product Owner and potentially Product Manager can participate (but the BA leads).
- QA team:
- Helps manage and track bugs found during UAT (UAT may surface issues QA didn’t catch).
- Developers:
- Needed to fix bugs found during UAT.
-
Avoid / be cautious with:
- People overly technical can miss the “real customer reality” perspective or approach testing differently.
- The speaker warns against turning UAT into a technical QA exercise.
3) Plan and set priorities (the “priority” part)
- Use input from a Product Owner / Product Manager / Project Manager to decide:
- Which defects/bugs are highest priority
- Which issues must be fixed before production release
- Which can be deferred and handled after release
- Establish a process so priority is clear and someone owns it.
- Guidance:
- If it’s a missing critical feature, treat it as urgent.
- Otherwise, avoid overloading the release with low-value issues.
4) Ensure knowledge of existing functionality + improvements
- Understand how the system works today, including:
- Interactions with other components/data
- How to write meaningful test cases
- Understand the new changes/enhancements in detail.
- Explicitly consider edge cases, not just the happy path:
- How the system should behave and recover when things go wrong
- Preventing duplicates and handling unusual scenarios
5) Use both ad-hoc and guided testing (balanced approach)
- The speaker argues for a managed UAT rather than purely ad hoc:
- Ad hoc helps detect common mistakes anyone might make without instructions.
- Ad hoc alone leads to missed scenarios (users don’t naturally follow the same “script” testers would).
- Recommended approach:
- Start with ad hoc exploration first (enthusiasm, discovery).
- Then introduce exact steps / test cases to deliberately cover edge cases.
- Keep steps non-boring using high-level test cases that still cover required scenarios.
6) Set up a production-like environment (critical)
- Environment is essential: if it’s wrong, testing results are unreliable.
- Avoid running UAT like a pure QA environment; it may not reflect real user data behavior.
- Aim for:
- Production-like configuration
- Production-like permissions and roles
- Production-like data (copy working data or create realistic datasets and load them)
- Environment examples:
- Correct login access
- Correct roles/permissions so users can test different views
7) Ensure QA is completed before UAT begins
- QA must be finished (unit testing, smoke testing, regression, etc.).
- Do not try to use UAT testers as additional QA.
- Merging QA and UAT causes headaches, schedule risk, and role confusion.
8) Prepare logistics and support testing
- Send invitations in advance; reserve dedicated time for testers.
- Make the BA/lead available during testing to answer questions and avoid duplicate errors.
- Testing focus:
- Testers should be dedicated to UAT during test sessions (no multitasking).
- Virtual sessions may help (screenshots, ongoing access to the meeting), but focus is still important.
9) Write UAT test cases effectively
- Prefer high-level steps (not click-by-click) to match how real users work.
- Include test-case structure elements:
- Prerequisites (which environment, what must be configured)
- Purpose (what the test checks: empty state, edge case, etc.)
- Logical step groups (split long tests)
- Target guideline: max ~10 steps per section
- Expected outcomes (optional in some cases, but can verify correctness)
- Test yourself first:
- Run through test cases to confirm they reveal the intended issues and don’t waste testers’ time.
10) Implement bug/problem logging (avoid chaos and duplicates)
-
Preferred approach:
- Testers record issues in a shared structured problem log (e.g., an Excel sheet template).
- The BA or QA team then creates the official Jira issues to prevent duplicates and inconsistent bug-writing style.
-
Problem log should include:
- Test area/module (e.g., empty state, app, credit score)
- Description with reproduction details (e.g., account number, identifying info)
- Screenshots
- URL or identifiers if applicable (web app URL, account ID, username)
- Environment where it occurred (sandbox/preview/QA—not production)
- Who reported / which tester observed it
- Status (open/fixed/deferred/etc.)
- Error type/category (e.g., missing requirement, design gap, development gap)
- Jira issue number if already created
- Priority (what should be fixed before release vs after)
-
Emphasis:
- Create Jira bugs only for items you believe should matter before or right after release; otherwise Jira becomes unmanageable.
11) Retest and obtain sign-off
- Report bugs early to QA/development.
- Retest once fixed to build confidence.
- Conclude UAT when:
- Participants sign off that the feature works well in the production-like environment
- The broader project team is informed that UAT is complete
12) Final checklist for a successful UAT (condensed)
- Schedule the right people (team availability and roles)
- Avoid duplicate bug creation (use one designated bug-creation owner/workflow)
- Grant users special privileges/appropriate permissions
- Meet regularly to prioritize bugs (daily prioritization mentioned)
- Create high-priority bugs only (to prevent overload)
- Set up production-like environment + correct data
- Write high-level test cases
Tools / templates mentioned
- The creator offers downloadable templates on their website:
- UAT test case template
- UAT bug tracking list template
- Website reference: caroliss.com → templates
Speakers / sources featured
- Primary speaker: The YouTube presenter/instructor (name not stated in the subtitles), teaching “Business Analyst Training” content on UAT planning.
- Sources: No external sources or additional speakers are cited in the subtitles.
Rate this summary
Your feedback will help improve summaries.
Improve this summary
Reprocess with a stronger model when the summary feels incomplete or inaccurate.
Translate summary in another language
Ask questions to this video
Chat for follow-up questions, clarifications, and source-backed answers.