This video is a rapid-fire review course for the 2026 Construction Safety Engineer Practical Exam (필답형), organized as an “all-in-one” handwriting exam prep. The instructor repeatedly emphasizes memorizing key matching pairs, numerical standards, checklists, and required documents that commonly appear in fill-in-the-blank or matching questions.
Across the sessions, the core themes include:
- Device/operator safety mechanisms and their correct “matched” terms/ratings
- Stability and structural safety: cranes, scaffolds, formwork, tunnels, excavation slopes
- Pre-work inspections and supervisor check points
- Risk prediction & safety management systems (plan requirements, costs vs. progress)
- Compliance documents and reporting obligations (accidents, serious incidents, MSDS, risk prevention plans)
- Safety signs (prohibition/warning color & symbol rules) and hazard categories
- Numerical standards (safety factors, angles, spacing, lighting lux, deadlines, insurance fee thresholds)
- Demolition methods and preventive considerations
- Safety education/training hours and criteria
- Statistics formulas (frequency rate/intensity rate/FSI, mortality, safety score evaluation)
Methodologies / instruction-like content
1) Matching safety devices to machines/equipment (examples)
- Acetylene welding device
- Requires a stabilizer
- Purpose concept: gas safety / protection mechanism
- Boiler
- Protection device: pressure relief device
- Powered manual planer
- Device to prevent blade contact: guard
- AC arc welder
- Needs automatic protection to prevent electric shock accidents
- Answer mentions a rated protection device / rated breaker / breaker protection
- Pile driver / pile extractor
- Hoisting wire rope stability (safety) factor: ≥ 5
- Must meet drum wrap/length requirements (noted below)
2) Hoisting wire rope / pile driver requirements (numerical rules)
- Safety factor (stability factor) for hoisting wire rope
- Must be 5 or higher
- Drum wrap / length requirement (key emphasis)
- Rope length must be enough to wrap at least twice and still have remaining rope
- Additional phrasing includes:
- Drum shaft length must be L × 15 or more
- Related “≥ 15×” drum-width spacing/wrap rule
- Employer’s regulation (paraphrased)
- When using a hoist: drum shaft / axle distance / rope spacing must satisfy multiple-times-of-drum-width conditions
- Video phrasing includes “more than 15 times” / “≥15×.”
3) Aerial work platform (riding/operational checks)
Supervisor pre-operation / operational checks focus on verifying:
- Emergency stop
- Confirm function; ensure proper stopping if platform rises unexpectedly
- Emergency descent prevention device
- Check for abnormality during operation
- Overload prevention device
- Check operation/presence for the wire rope or chain drive system
- Outriggers
- Check presence/absence and work surface flatness
- Also check for uneven surfaces and abnormal conditions
- Live-line work device
- Check for groove cracks / breakage / other damage
Format emphasized in exam notes: “Write down: presence/absence + abnormalities.”
4) Supervisor pre-start inspection items (by equipment/work type)
The video stresses memorizing pre-start inspection items by category, including examples such as:
- Vehicles
- Forklifts
- Conveyors
- Compressors
- Robots
- Cranes (including mobile cranes)
- Aerial work platforms
It also groups fire-risk work (welding/cutting) as a memorization list commonly found in textbooks.
5) Industrial safety & health management costs vs. progress rate (thresholds)
Usage standards for the completion/progress rate are presented as thresholds:
- ≥ 50% and < 70%
- ≥ 70% and < 90%
- ≥ 90%
Main exam lesson: Safety management fees must be used in proportion to construction progress. Using too little relative to progress can be a violation.
6) Risk prediction training stages (4-step flow)
“Risk prediction training” is taught as an exam-friendly 4-step sequence:
- Stage 1: Precognition (phenomenon recognition)
- Identify potential risk factors on site
- Stage 2: Root-cause identification
- Analyze “why” and the cause chain
- Stage 3: Countermeasure establishment
- Implement practical measures to prevent accidents
- Stage 4: Goal setting / implementation
- Set safe behavioral goals and apply them
7) Reporting construction accidents / serious incidents
Construction accident notification (3 required content elements)
The video lists three mandatory elements:
- When, where, what
- Circumstances (what happened/how, past sequence)
- Measures taken and future actions outlook
Serious incidents (major incident triggers; examples)
Examples include conditions such as:
- 1 or more deaths
- 2 or more persons injured requiring medical care for 3+ months simultaneously
- 10+ occupational disease cases simultaneously, etc. (as specified in the video)
8) Record preservation for industrial accidents (3 categories)
- Workplace overview + worker personal details
- Occurrence date/time & place (chapter 1)
- Causes/process + recurrence prevention plan
9) Fall prevention & edge protection standards (numeric emphasis)
Common repeated types:
- Fall protection nets (horizontal/tilted installation)
- Safety railings at roof edges / passageways
- Toeboards / handrail components
Key numeric examples emphasized:
- Net installation height relationship
- Vertical distance from work surface to net installation point: ≤ 10 m
- Net sag ratio
- Install horizontally
- Sag on the short side: ≥ 12% of the short-side length
- Example: 3 m → 36 cm
- External installation protrusion
- Protruding length from wall surface: ≥ 3 m
- The rule set appears together with ≤ 10 m vertical distance
- Roof with weak materials
- Footrest width and step width: ≥ 30 cm
10) Excavation slope stability (slope ratio standards)
Slope ratios depend on soil condition. The video presents combinations such as:
- 1 : 1.8 (sand/weak combinations)
- 1 : 1.0 for certain conditions
- 1 : 0.5 for harder soil
- 1 : 1.2 under other specified categories
11) NATM tunnel method core exam points
- Main method: NATM (New Austrian Tunneling Method)
- Stage investigation check items (3 named):
- Geology/strata investigation results
- Groundwater level
- Soil distribution status
- Also mentioned: confirmations including support/boring locations
12) Safety sign identification standards (colors/symbol layout)
Exam rule taught through repeated examples:
- Prohibition signs
- White background
- Red basic model
- Black symbol
- Diagonal slash on the red circle
- Warning signs
- Yellow triangle / danger symbols / exclamation mark style
- Instruction/info signs
- Blue background with white symbols
- Green information/relief signage, etc.
(Examples such as “no entry,” “no walking,” “no vehicles,” “no smoking,” “danger” are shown.)
13) Cement formwork removal by temperature & type (memorization table)
Rule: dismantle timing depends on cement type and ambient temperature.
Examples stated include:
- Portland cement
- Fastest at ≥ 20°C
- If lower, timing extends (e.g., 10–20°C longer)
- High early strength / blast furnace slag cement types
- Type 1/Type 2 have different minimum days
- Differences depend on 20°C vs. 10–20°C cases
Main lesson: memorize the mapping (cement type + temperature) → days.
14) Safety education/training hours (construction safety & health)
Three worker categories and standard hours:
- Supervisors
- Regular training: ≥ 16 hrs/year
- Initial on hiring: 8 hrs
- When duties change: ≥ 2 hrs
- Safety/health management officer
- Initial/new: ≥ 6 hrs
- Specialized agency personnel
- Initial/new: ≥ 34 hrs
- Refresh/regular schedule mentioned as > 24 hrs
Special training content emphasized for explosive blasting, including:
- Explosives handling procedures and evacuation
- Protective structures and standards
- Protective equipment and signaling methods (3–4 content blocks are named.)
15) Risk prevention plan submission conditions (construction projects)
Major categories requiring submission (memorize as exam rules):
- Height above ground ≥ 31 m
- Cold storage facilities with side area ≥ 5,000 m²
- Bridges with span length ≥ 50 m
- Tunnels (context tied to NATM discussion earlier)
- Dams, including dedicated categories:
- multipurpose / power generation / water supply dedicated dams
- reservoir threshold mentioned: e.g., ≥ 20 million tons (for water supply dedicated)
- Excavation depth ≥ 10 m
Exam lesson: these are treated as unconditional risk prevention plan requirements.
16) Safety manager / safety officer appointment counts (cost-based)
A cost-to-headcount “table concept” is taught:
- Construction cost bands (e.g., 80b, 150b, 220b, etc.)
- Map to number of safety managers
- Additional condition:
- Equivalent staffing across the full period
- Mentions a 15/100 time rule
17) Fatalities, injury stats & formulas (industrial accident statistics)
Core formulas taught:
- Frequency rate
- Intensity rate
- Uses concepts like suspension rate, business suspension, and “lost days” conversions
- Includes a conversion table:
- Severity/grade (death vs. occupational disease grade)
- → “lost days” equivalents
- FSI (comprehensive safety index)
- Based on frequency/intensity
- Video structure described like:
- FSI = (frequency factor) × sqrt(intensity rate)
18) Safety score evaluation (workplace risk severity index)
Judgment logic described:
- Compute a safety score difference using past vs. current accident frequency/intensity indices
- Decision thresholds:
- ≤ -2: safer than the past
- Between -2 and +2: no significant difference
- ≥ +2: significantly worse
Speakers / sources featured
- Fighting Honggong TTV (channel/instructor/voice throughout)
Rate this summary
Your feedback will help improve summaries.
Improve this summary
Reprocess with a stronger model when the summary feels incomplete or inaccurate.
Translate summary in another language
Ask questions to this video
Chat for follow-up questions, clarifications, and source-backed answers.