Goal + Tight Timeline

  • Date: Dec 23
  • Status: They weren’t on track to fully move in by Christmas.
  • Original target: Move in by Dec 25 / Christmas
  • Time window: Only ~12 days from Dec 13 to finish key work.

By Dec 23, several major tasks were still in progress, making the timeline too tight.

Major Build Tasks Needed to Move In (Still in Progress)

Install/Finish

  • Garage door
  • Internal doors (installed a few days prior)
  • Electrical work
  • Tiles and ceiling in common areas
  • Float bedroom floors (several rooms still unfinished)
  • Waterproofing on portions of the slab area
  • Paint the interior
    • Primer is already done in some areas

Painting Speed-Up Idea

  • Consider outsourcing painting to speed things up.

Common Area Tiling (Not Fully Complete)

  • Tiling is done on the dining side
  • Missing tiling around the guest toilet area
    • They plan to finish later once plumbing is done

Repairs / Corrections

  • A window installed upside down
    • It can’t be pushed open correctly
    • Planned fixes:
      • Ask the installer to correct it
      • Fix/adjust the kitchen door latch (latch missing)

Finishing Details

  • Add skirting
    • Done in one area already; more needed
  • Fix missing/damaged plugs (“easy fix”)
  • Add window handles
  • Install curtain rails before moving in

Outdoor + Practical Chores

  • Clear rubble / tidy the back area
    • Yard is full of debris and trees
  • Reconfigure/relocate a toilet using blocks (“using the bubble”)
    • Move it to the back area
  • Plan a small veranda-style extension
    • For sitting and improved water drainage
  • Outside painting planned later

Materials Shopping + Where They Went

  • Traveled to China Mall (Centurion) to look for outside lights
  • Bought a large chunk of building material from Moet’s Build

Notable Product Choice

  • For exterior lighting, they selected solar rechargeable lights
  • They say the lights are working well

Budget / Spend (Reported: “R100k in a week”)

  • They track expenses in a spreadsheet, summarizing major categories.

Key Totals

  • Tiles: ~R21,075.75 (tiles + add-ons)
    • Tile-related total (including other items + labor): about R27,500
    • Note: video text has some transcription errors
  • Ceilings: R15,120
  • Paint: R4,928
    • Includes materials + brushes/primer/tools (they do the painting themselves)
  • Doors: R15,553
    • Garage door is the biggest part
  • Garage door: ~R12,750
    • Door + transport/installer travel
  • Additional items (incl. curtain rails): ~R22,651
  • Electrical: ~R3,319
  • Delivery costs (in/around the village): R1,940
  • Grand total: ~R85,312
    • They state this totals to close to R100k to get the house ready to move in
    • Likely rounding and/or missing transcript text.

Sponsor / Business Tool Mention (Vlog Content)

  • Sponsor: odo (all-in-one business management software)
  • They mention odo tools for business operations and that you can create a website using a drag-and-drop website builder
  • Claim: “first app on odo is free for life”
    • Includes hosting/support and a free domain for a year

Notable Locations, Products, or Speakers

Locations

  • China Mall (Centurion)
  • “the Village” (their build site)
  • Moet’s Build (materials store)

Products

  • Solar rechargeable outdoor lights
  • Building materials such as tiles, primer/paint, skirting, curtain rails

Speaker

  • The main narrator (South African YouTuber) throughout the content
  • Sponsor mention includes odo

Original video