SAFRAN - La maintenance d'un train d'atterrissage
Main summary
Key takeaways
Main ideas / lessons from the video
-
The video is the third (final) episode in a Safran Landing Systems series explaining the life cycle of a landing gear: design/modeling → production/assembly → maintenance and repair.
-
It shows a typical landing gear overhaul workflow, including:
- Receiving and disassembling components
- Expert inspection and sorting parts
- Repair / surface treatments (chrome-related work, coatings, machining, grinding)
- Non-destructive testing (NDT) to find internal/hidden defects
- Reassembly, including conditioning tests for shock absorbers
- Final acceptance / return-to-service approval with the required certification documents
- A recurring theme is standards-driven work: the process follows manuals/specs, uses calibrated tools, and complies with regulatory/traceability requirements.
- Parts are repeatedly classified as:
- Rejected (red)
- Accepted as-is (green)
- Sent for repair/remediation (yellow) (often requiring NDT)
Methodology / process (detailed)
1) Setup: workshop overview and disassembly workflow (received landing gear)
- The landing gear is received at the end of its service cycle and undergoes complete disassembly (“stripping it, and restoring it from scratch”).
- Disassembly stages include:
- Pure disassembly
- Misalignment / temperature-difference assembly concepts for separating parts mounted together
- Stripping
- Leveling/inspection for corrosion and surface damage (e.g., chrome wear/scratches)
2) Shock absorber handling during disassembly (critical, time-consuming step)
- The shock absorber is deflated and drained first because it “takes the most time.”
- Inside shock absorbers:
- Hydraulic oil
- Nitrogen
- A safety approach is used so the shock absorber does not pop out unexpectedly.
3) Temperature-difference assembly concept (to remove shafts/spindles)
- Principle:
- Heat one component in an oven (example: 110°C) so it expands.
- Cool the other component in liquid nitrogen so it contracts.
- When both return to ambient temperature, parts “solidify,” making removal/fit easier.
- Materials noted:
- Aluminum (e.g., rocker arm/housing) expands more
- Steel (e.g., shafts) contracts more / expands less
- The technique is applied similarly across multiple shafts.
4) Stripping step: removing chrome and preparing for corrosion evaluation
- Chrome removal/cleanup:
- Sanding to remove worn chrome.
- Protect chrome during sandblasting to prevent sparks/contamination (“chrome needs protection”).
- Sandblasting and micro-inspection:
- Sandblast to reveal corrosion underneath.
- Use “micro-cap”/magnification to inspect corrosion spots.
- Key rejection rule:
- If the broaching hole is corroded, the part is not repairable and is rejected immediately.
5) Post-stripping inspection and dimensional verification
- After preliminary checks, experts verify:
- Outside corrosion presence
- Surface condition
- Dimensions within specification
- Dimensional measurement workflow:
- Record part serial number in official paperwork.
- Use calibrated instruments.
- Measure multiple locations and cross-check to detect:
- Ovalization
- Effects of excessive chrome wear
- Measurements are recorded with tool identity and validation in traceable databases.
6) Parts sorting system (color-coded bins)
After initial inspection/stripping:
- Red box
- “Everything that’s rejected,” especially parts corroded such that repair isn’t possible or is outside CMM repair scope.
- Often includes parts sent for reorder/replacement and customer evidence via photos.
- Green box
- Parts that are good and require no expert repair cycle.
- Yellow box
- Parts needing remediation/regeneration or additional expert processing.
- Example: an axle sent to NDT.
7) Expert inspection steps (beyond initial stripping)
For parts in the yellow bin, the expert performs:
- Visual inspection under magnification/lighting:
- Inspect key areas carefully (especially the broaching hole)
- Circle/mark defects
- Dimensional measurement:
- Decide the next step in the repair cycle
8) Example of decisions: plating suitability and rejection logic
- The video contrasts:
- Parts with usable coating characteristics
- Versus parts with severe corrosion (described as rough like a “nail file”)
- If outside the chrome plating repair scope, the part is discarded because:
- Severe corrosion likely exists in holes/passages too
- Assembly contamination risk may occur (cross-contamination between parts)
Surface treatment department workflow (coatings, grinding, plating, sacrificial metal)
9) Grinding and preparation before plating
- Surface treatment prepares parts that were machined outside spec.
- Grinding purposes:
- Restore dimensions
- Improve friction between interacting surfaces
- Example sequence:
- Remove chrome and grind in steel to eliminate corrosion points.
- Shot blasting: project steel particles to stress the surface and increase resistance.
- Chrome plating:
- Electrolytic deposition in baths (“deposited onto the steel”).
- May require thick chrome, then grinding back to final dimension because:
- Chrome is granular
- Grinding alone can cause concavities unless thickness is built then finished smooth.
10) Cage plating (sacrificial metal coating)
- After chrome plating and grinding:
- Cage plating is applied.
- The sacrificial metal concept helps provide corrosion protection.
Machine tool / grinding department workflow (chrome can’t be machined except by grinding)
11) Grinding process for chromed/re-chromed parts
- Key rule:
- Chrome cannot be machined except by grinding because it is too hard.
- Grinding setup:
- Parts held between centers (perfect roundness required).
- Grinding wheel rotates while the part rotates in opposite direction.
- Coolant/lubricant is used to prevent burns.
- Roughing vs finishing (mentioned):
- Roughing: about 5 microns per pass
- Finishing: about 2.5 microns per pass
- Grinding outputs:
- Diameter restored to correct size (including post-rechroming workflow)
12) Measurement during grinding
- Operators monitor:
- Thickness differences
- Progress in micrometers / controlled increments
- Checks include micrometers and confirmation of dimensions/cylindricity.
- Cylindricity adjustment is described via tilting/rotating.
13) CNC grinding (diamond-cutting wheel concept)
- Newer CNC machines:
- Use programs including bearing surfaces.
- Use diamond sharpening to keep the grinding wheel effective.
- High-level sequence:
- Coolant starts
- Roughing dives
- Diamond-cutting / finishing passes
- Challenge mentioned:
- Chrome can form paste and clog grinding wheels (diamond-wheel helps mitigate removal issues).
Non-destructive testing (NDT) and acceptance checks
14) NDT inspector’s mission
- NDT looks for indications that could weaken parts.
- Techniques mentioned (used in aeronautics):
- Magnetic particle inspection
- Magnetic flux density (MFD) testing
- Electric current testing
- Radiography
- Ultrasound
- Dinard site specifically mentioned:
- MFD
- Electric current testing
- Other developing/less common techniques mentioned:
- “Barcosone” testing (as transcribed)
- Acid etching for metal corrosion
15) Magnetic Particle Inspection (MFD) principle
- Magnetize the part so magnetic domains align.
- Defects disrupt field lines.
- Apply ferromagnetic particles/solution so particles collect where defects disturb the field.
- Defects are identified visually via their patterns.
16) Dye penetrant / “electric current testing” confusion note (core penetrant logic)
- A penetrant with strong wetting (high capillary action) is used:
- Penetrant seeps into defects
- Excess is removed
- Developer is applied; humidity/inspection helps pull penetrant back out for visibility
- Capillary effect is described as about 10× water.
17) Electric current testing demonstration (bench)
- Current passed near/through a part generates a magnetic field (via a copper conductor).
- Field value bounds are compared against a maximum permissible value.
- Developer/ferromagnetic powder reveals defects (left intentionally visible for demonstration).
- Additional step:
- Change direction to detect defects from all orientations (crossed field concept).
- After inspection:
- Demagnetize using an alternating current solenoid method and a “sizing cycle” down to low field strength.
18) Penetrant testing booth: checking chrome cracks (“crazing”)
- Goal:
- Detect “crazing” (small natural cracks in chrome).
- Acceptance logic:
- Some crazing can be necessary for thick chrome.
- Too much crazing can allow corrosion to enter.
- Avoid/verify:
- Very deep cracks
- Grinding cracks
- Confirming a suspicious defect:
- Wipe with solvent on cotton ball to reveal a very fine line.
- Visual confirmation indicates a crack.
Reassembly workflow (shock absorber conditioning + overall reassembly)
19) Reassembly starting point: kitting and staged assembly
- Incoming parts are “kitted” (new or refurbished components).
- For each part, checks/verification occur before use (mentions NDT painting and “cadmium machining” in the process flow).
20) Temperature-difference reassembly for shock absorber internal components
- Longest assembly involves slide/spindle components:
- Spindle heated in nitrogen at about -150°C to -180°C
- Mating part heated in oven around 150°C
- Time note:
- Cooling/assembly can take about a day.
21) Shock absorber conditioning tests (mandatory before service)
- A large industrial press performs:
- Compression and rebound tests
- Programs are pre-recorded and run automatically.
- After testing:
- Values must match the curve within minimum/maximum tolerances
- If out of tolerance, possible causes:
- Too much/too little oil
- Too much/too little nitrogen
22) Shock absorber “conditioning” procedure described
- Assemble fully first.
- Condition with air (“3520 air” as transcribed) and regulate:
- Inject oil via air pressure using valves
- Reset to zero to define oil clearance.
- Add nitrogen per specification (example range mentioned: 19 to 23 bars).
- Readouts are checked on fittings to confirm pressures.
23) Final assembly steps for the landing gear unit
After conditioning and press testing:
- Mount cover, switches, hydraulic connections
- Route hoses
- Apply grease on fittings
- Connect electrical harness and ground braid
- Use greasepaper/protective wraps:
- Protect chrome surfaces
- Store on shelves (protection > 10 years mentioned)
- Apply protective sealant “PR” to sensitive areas to prevent corrosion and loosening, especially around switches and top regions.
Return-to-service approval / certification workflow
24) Benjamin’s role in approval (release to service)
- Approval department checks:
- Disassembly steps
- Documentation used
- Processes followed
- Compliance with standards/regulations and personnel requirements
- Output:
- Issuance of a release certificate
- Regulatory frameworks mentioned (examples):
- NOASA (European part, as transcribed)
- FA (U.S.)
- TCCA (Canada)
- UK uses CAC
- China uses CAC
- Service categories described (four):
- Repair (simple repair)
- Overall service (complete overhaul)
- Bench test (inspection/test)
- Modification
- Documentation package:
- The release certificate goes with a shop report (detailed record with photos)
- Purpose:
- Allows aircraft manufacturer installation and certifies the equipment is airworthy.
Speakers / sources featured (identified people)
- Narrator / main presenter (also introduced as a methods engineer at Safran; Elodie appears as an interviewer)
- Alexis (workshop colleague; disassembly stages and shock absorber disassembly prep)
- Elodie (interviewer; appears alongside multiple colleagues)
- Adie (brief appearance in greeting lines; co-host/interlocutor likely)
- Alain (expert; dimensional measurement and inspection from the yellow bin)
- Baptiste (methods department; mission of methods office; technical questions)
- Samuel (mentioned by Baptiste as a design engineer to consult)
- Gilda (mentioned as someone to meet in the machine tool room; dialogue not fully present)
- Gill (grinder; grinding of chromed parts and grinding machine operation)
- Régis (NDT inspector and expert; NDT techniques and demonstrations)
- Yvon (reassembly lead; reassembling landing gear and shock absorber conditioning/press tests)
- Benjamin (approval department; release certificate and shop report; return-to-service certification)
- Safran Landing Systems / Safran Landing Systems Services site at Dinard Airport (organizational source/context)
Rate this summary
Your feedback will help improve summaries.
Improve this summary
Reprocess with a stronger model when the summary feels incomplete or inaccurate.
Translate summary in another language
Ask questions to this video
Chat for follow-up questions, clarifications, and source-backed answers.